Principal Dimensions
| Length Overall : |
190 m |
| Beam : |
45 m |
| Depth : |
12 m |
| Built : |
2006 |
| Fitted Out : |
2008 |
| Classification : |
ABS |
| Notation : |
+A1 Barge - PAS - DPS3 |
| Safety Compliant : |
IMO, SOLAS & MODU Code |
| Capacity : |
500 Persons (Can be increased) |
| Clear Deck : |
3,500 m² |
| Deck Strength : |
15 tons/ m² |
| Deck Plate : |
35 mm high tensile |
Tank Capacities
| Ballast : |
25000 m³ |
| Fresh Water : |
3000 m³ |
| Fuel Oil : |
1000 m³ |
| L.O. : |
40 m³ |
Deck Machinery
| Tugger Winch : |
4 units |
| Deck Crane : |
250 Tons Crawler -
Click here to Spec Sheets |
| Main Crane : |
IHC 35000 |
| Boom length : |
67 Metres |
| Capacities : |
1500 Tons at 22.5 m |
| |
1100 Tons at 30 m |
| |
800 Tons at 40 m |
| Helideck : |
21 x 21 m, CAP 437 |
| |
Suitable for S61/S92 |
Mooring System
| 8-Point Mooring : |
8 x 12 Ton Delta Flipper Anchors
4 x Double Drum Winches
MacGregor Plimsoll WF-135/250 |
| Pull / Brake : |
135 tons / 250 tons |
| Wire : |
8 x 2000 m x 63 mm Dia |
| Controls : |
Local & Remote with CCTV |
| |
Click For Spec Sheet |
Positioning System
| Thrusters : |
4 x 2200 kW - Stone Vickers Azimuth |
| |
1 x 1500 kW - HRP 7000 Azimuth |
| |
2 x 800 kW - HRP 5000 Tunnel |
|
DP3 Control System
| DP3 : |
Kongsberg DP-21 & DP-11
1 x HiPap 500
2 x DGPS
2 x Fanbeam
2 x LW Taut Wire Mk15
3 x Gyro Compass 3 x MRU
3 x Wind Sensor Radius |
Engine Room Machinery
| Generators : |
20 units x Cat 3516
2200 Kw / 60 hZ / 440 V / 3ph |
| Emergency : |
2 x Cat 3406 |
| Ballast P/P : |
2 x 3000 m³/h |
| Bilge Pump : |
1 x 200m³/h |
| G.S. & Fire Pump : |
2 x 200 m³/h |
| F.O. Transfer Pump : |
2 x 40 m³/h |
| F.O. Purifier : |
1 x 1500L/h |
| Sewage Plant : |
Hamworthy
IMO & USCG compliant -
Click for Spec Sheet
|
| Dirty Oil Pump : |
1 x 3 m³/h |
| F.W. Makers : |
Upto 200 tons/Day |
| Emergency Fire Pump : |
1 x 100 m³/h @ 65m |
| Foam Monitor Pump : |
1 x 180 m³/h @ 100m |
Fire Safety Plan
Facilities
Accommodation for 500 persons. All cabins with private
facilities and fitted w / CAT6 cabling for Internet, telephone &
TV. |
| Offices : |
15 x 25 m2 each |
| Galley : |
Fully equipped |
| Chillers : |
60 m² |
| Freezers : |
60 m² |
| Dry Store : |
60 m² |
| Mess Room : |
200 pax capacity |
| Hospital : |
3 berths w/ medic office |
| Recreation : |
1 x 80 m²
1 x 50 m²
|
| Gym : |
60 m² |
| Workshop : |
100 m² fitted with bench vices, drill,
grinder, saw, lathe, compressed air &
power sockets. |
| CCTV : |
Fitted throughout |
|